Culvert repair and replacement project delayed near Brandon
Several culvert repair and replacement projects in west central Minnesota have been delayed at least one week because of contractor scheduling issues.
Several culvert repair and replacement projects in west central Minnesota have been delayed at least one week because of contractor scheduling issues. A new start date will be released before the projects begin.
The affected locations include:
--Interstate 94 eastbound at the Brandon interchange
--Highway 12 between Highway 59 and Highway 119
--Highway 27 between Browns Valley and Highway 117
--Highway 28 between Johnson and Graceville
--Highway 55 between Highway 59 and Highway 9
--Highway 55 between Highway 9 and Highway 75
--Highway 75 between Wheaton and Highway 55
--Highway 75 between Dumont and Wheaton
--Highway 114 between Highway 27 and Highway 55
--Highway 119 between Highway 12 and Appleton
The Minnesota Department of Transportation urges motorists to always drive with caution, slow down in work zones and never enter a road blocked with barriers or cones. For statewide travel information, visit www.511mn.org, call 5-1-1 or log on to www.mndot.gov.
Tags: local news, news, culverts
More from around the web